Verona WALL HUNG GAS BOILER Installation Manual

Browse online or download Installation Manual for Water heaters & boilers Verona WALL HUNG GAS BOILER. Verona WALL HUNG GAS BOILER Installation manual [en] User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 54
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
BOILER INSTALLATION, OPERATION
INSTRUCTIONS
HOT WATER SUPPLY
Please Read Instructions Carefully
Save for Future Reference
CENTRAL HEATING AND DOMESTIC
Riva
COMBI
WALL HUNG GAS BOILER FOR
WARNING: If the information in this manual is not
followed exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
Do not store or use gasoline or other flammable vapors and liquids
in the vicinity of this or any other appliance.
— WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electric switch; do not use any phone in your
building.
Immediately call your gas supplier from a neighbor’s phone.
Follow the gas supplier’s instructions.
If you can not reach your gas supplier call the fire department.
— Installation and service must be performed by a qualified installer,
service agency or the gas supplier.
Manufactured by:
Biasi S.p.A.
V
erona, Ital
y
Distributed By:
Quincy Hydronic Technology, Inc.
3560 Lafayette Road
Portsmouth, NH 03801
Phone: 603-334-6400
Fax: 603-334-6401
RIVA COMBI MANUAL - REV B
Page view 0
1 2 3 4 5 6 ... 53 54

Summary of Contents

Page 1 - INSTRUCTIONS

BOILER INSTALLATION, OPERATION INSTRUCTIONS HOT WATER SUPPLY Please Read Instructions Carefully

Page 2 - RIVA COMBI MANUAL - REV B

ENERGY CAPACITY Nominal heat input (0/2000ft) MBH 122.8 Nominal heat input (2000/4500ft) MBH 116.7 Minimum heat input MBH 49.5 Maximum useful ou

Page 3

3. Parts List Primary Components: 1245369710118121420181319211522162417263525 1 Pump 2 Pump vent plug 3 Automatic air purger valve 4 Modulation ga

Page 4 - Table of Contents

4. Internal Piping & Parts List 29133433261181912442035162821127222318369273132630152537383940 Note: • Pressure Relief Valves (#24,

Page 5

ye bk wh gy bu rdbkgygygyM~M~ttprobe NTCD.h.w. TemperatureProbe NTCC.h. temperatureCOMNOM~COMNONC123bkbubnrdrdgnyegywhburdbkbuwhgybugnyebk bkrd bk

Page 6

5.1 Sequence of Operation RIVA COMBI MANUAL - REV B 14

Page 7 - WARNING

6. Installation Location The installation location chosen must: • Comply with all clearances listed below. • Provide suitable location for the e

Page 8 - IMPORTANT INFORMATION

7. Exhaust Pipe Location CAUTION EXTERNAL VENT SURFACES ARE HOT. NOTE: USE ONLY LISTED COMPONENTS SUPPLIED WITH THE BOILER.SURFACE DISC

Page 9 - 1. General Information

condensate from the flue gases 8. Mounting Bracket After a suitable installation location is chosen, verify that the mounting wall is properly br

Page 10 - 2 17.0% 8.6%

5.33.3 3.03.7Figure 8.1 The Riva is a mechanical draft, side wall vented boiler. There are two side wall flue options available – separate and coax

Page 11 - 3. Parts List

system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any

Page 12

RIVA COMBI MANUAL - REV B 2

Page 13 - 5. Electric Diagrams

Figura 9.1 Coaxial 2.5/4.0 Restrictor SizeFrom 1.65 to 3.30 (ft) 41 From 3.30 to 8.86 (ft) 44 Separate 3.25/3.25 Restrictor SizeFor 1.65 (in) and

Page 14 - 5.1 Sequence of Operation

Figure 9.2 (Coaxial 2.5/4.0 inches – nominal lenght 3.3 ft) It can be fitted to allow discharge to the rear or either side of the boiler via the fla

Page 15 - 6. Installation Location

Figure 9.3 (Twin pipe φ 3.15 in) Various twin (split) pipes kits and optional accessories (elbows) are available to assist in the termination of the

Page 16 - 7. Exhaust Pipe Location

Test PortsExhaust CollarExhaust ElbowExhaust PipeRubber Wall Trim (2X)Exhaust Pipe End CapAir Intake ElbowAir Intake PipeAir Intake Collar Figure 9.4

Page 17 - 8. Mounting Bracket

Figure 9.6 (Twin Pipe Φ 3.25 in) This configuration of the twin pipe kit allows to discharge the exhaust gasses outside. The air supply is obtained

Page 18 - 9. Venting

Figure 9.7 (Twin Pipe Φ 3.25 in) These kits allow for separation of the air supply pipe from the pipe that discharges the exhaust gasses. Consequent

Page 19 - 9. Venting Cont

Figure 9.8 (vertical pipe Φ 3.1 / Φ 4.9 in) This kit allows vertical termination of the flue pipe through the roof. The kit is 1.2 min length. Exten

Page 20 - 8. Venting Cont

plastic bag in the boiler package. A) Stainless steel gas pipe FGABCD EH I JFigure 10.1 B) Main circuit drain cock C) C.h. return copper pipe D) C.h.

Page 22

RIVA COMBI MANUAL - REV B 27 11. Gas Pipe Connections Gas supply piping is to be sized and installed properly in order to provide a supply of gas

Page 23

Dear Customer: Thank you for buying a Biasi Riva Combi Boiler System. The Riva Combi is a high efficiency, non-condensing, wall mounted gas boiler w

Page 24

12. Electrical Connections/Wiring 12.1 Power Connection: BAB Figure 12.1 Removing Front Panel: • Remove the front panel by removing screws A and s

Page 25

12. Electrical Connections/Wiring Cont. 12.3 Room Thermostat Connection: • The room thermostat must be connected to the terminal block situated

Page 26 - 10. Pipe Connections

12. Electrical Connections/Wiring Cont. 12.5 Zone Valve Micro Switch Connection: • The zone valve micro switch must be connected to the termina

Page 27 - Installation:

13. Circulator Sizing 13.1 Circulator capacity as a function of flow rate: Figura 13.1 The hydraulic specification in Fig 13.1 represent the pr

Page 28

14. Piping All external piping components are to be supplied by the installer. It is very important to use a Primary Secondary piping scheme whe

Page 29 - 11. Gas Pipe Connections

14. Piping 14.1 Primary – Secondary Piping: All external piping components are to be supplied by the installer. It is very important to use an h

Page 30 - 15 AMP BREAKER

14. Piping Cont. 14.2 Primary – Secondary Piping with Zone Valves: All external piping components are to be supplied by the installer. It is ver

Page 31

14. Piping Cont. 14.3 Manifold Piping with Zone Valves or Circulators (shown conn. to radiators): All external piping components are to be suppl

Page 32 - Terminal Block

RIVA COMBI MANUAL - REV B 36 15. Commissioning 15.1 Filling the d.h.w. System: • Close all hot water draw-off taps. cock (40 on Sections 4 and 1

Page 33 - 13. Circulator Sizing

15. Commissioning Cont. 15.3 Lighting the boiler: Note: If external controls are fitted (e.g. room thermostat) ensure they "call for heat"

Page 34 - Must be less than 8"

Table of Contents Section Title Section Number Page Number Warnings - 6-7 Important Information -

Page 35

15. Commissioning Cont. 15.5 Adjustment of the gas pressure: • Remove the front panel of the case. • Open the gas valve inlet pressure test p

Page 36 - 14. Piping Cont

15. Commissioning Cont. 15.7 Checking the burner ignition: • Turn the boiler OFF. • Open the gas valve outlet pressure test point 19 (figure

Page 37

15. Commissioning Cont. 15.9 Labels placement: 1423567 Figure 15.11 Warning: The installation is not complete unless labels supplied are placed

Page 38 - 15. Commissioning

15. Commissioning Cont. 15.10 Checking the flue system and combustion: • The flue system should be visually checked for soundness. Check all cl

Page 39 - 15. Commissioning Cont

16. Gas Conversion WARNINGS: Procedures to adapt the boiler to the type of gas available must be carried out by a competent and responsibl

Page 40

RIVA COMBI MANUAL – REV B 43ONOFF1234ONOFF1234Natural gas L.P.G. Figure 16.5 • Close the service panel. • Turn on the boiler. • Calibrate th

Page 41

17. Annual Maintenance 17.1 Warnings: The procedures detailed in this chapter must be carried out only by a professionally qualified person. Thus

Page 42

17. Annual Maintenance Cont. 17.5 Cleaning the primary heat exchanger: • Take off the front panel of the case, then the sealed chamber lid and

Page 43

17. Annual Maintenance Cont. Clean any that is found with an appropriate sized brush. • Inspect the venture device inside the outlet of the combust

Page 44 - 16. Gas Conversion

18. Vent Part Spares Part Description Order Number A Separate vent termination B Termination hardware C Wall gask

Page 45

Table of Contents Section Title Section Number Page Number Manifold Piping with Zone Valves or Circ. 14.3 29 Comm

Page 46 - 17. Annual Maintenance

18. Vent Part Spares Cont. Part Description Order Number A Coaxial intake pipe B Coaxial termination pipe C Coaxi

Page 47 - 17. Annual Maintenance Cont

18. Vent Part Spares Cont. Part Description Order Number A Roof flashing kit (pitched or flat) B Roof venting termination C Roof venting

Page 48 - Venturi test

RIVA COMBI MANUAL - REV B 49

Page 49 - 18. Vent Part Spares

RIVA COMBI MANUAL - REV B 47 18. Installer Notes System Checkout: Serial No.____________ Boiler Model No.___________________ Installer: Origin

Page 50 - 18. Vent Part Spares Cont

*1796212111* 17962.1211.1 2906 (44A4)USA

Page 51

Installer Notes 18 41 Boiler is certified as an indoor appliance. Do not install boiler outdoors or locate wher

Page 52

• Stale or smelly air. • The presence of soot or carbon in or around the appliance. • Very high

Page 53 - 18. Installer Notes

IMPORTANT INFORMATION Please read this page carefully. • ALL BOILERS MUST BE INSTALLED IN ACCORDANCE WITH NATIONAL, STATE AND LOCAL PLUMBING, HEAT

Page 54 - *1796212111*

The Riva Combi is a high efficiency, non-condensing, wall mounted gas boiler which provides central heat and domestic hot water. The boiler feat

Comments to this Manuals

No comments